Sr. No. | Risk identification | Probability of Occurrence | Severity | Detection | Risk Probability Number (RPN) | Current control / Mitigation Measure /Recommended action |
I. Dispensing | ||||||
1 | During dispensing of Material wrong materials label may be affixed. | 3 | 9 | 2 | 54 | Material comes one by one into the dispensing cubicle during dispensing and verifies by both production and IPQA personnel. |
2 | Contamination can occur during dispensing because of handling of wrong material, improper environmental controls, improper cleaning etc. | 7 | 2 | 2 | 28 | Separate area is available for dispensing Line clearance is taken prior to dispensing. |
3 | Wrong quantity of material can be dispensed due to weighing balance and / calculation error. | 2 | 9 | 2 | 36 | The materials are weighed in respective balances which are calibrated as per the frequency specified in the SOP .And the materials are verified by 2 personnel’s in order to eliminate manual errors also calculation is verified by the QA. |
4 | Dispensing of moisture sensitive material | 2 | 9 | 2 | 36 | Dispensing is done under controlled condition as specified in the BPRR. |
5 | Temp., Relative humidity and differential pressure may go out of limit. | 5 | 4 | 3 | 60 | All the conditions are verified from the BPRR and SOP before starting the process. |
II. Sifting | ||||||
1 | Sifting may be done through wrong sieves. | 2 | 8 | 2 | 32 | Sieve no is verified from the BPRR before commencing the operation. |
2 | Sifting may be done through damaged sieves. | 2 | 8 | 2 | 32 | Sieve integrity is checked before and after sifting process. |
3 | Contamination may be occurred from the left over residue of the previous product. | 2 | 8 | 3 | 48 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before the sifting process. |
4 | Temp., Relative humidity and differential pressure may go out of limit. | 5 | 4 | 3 | 60 | All the conditions are verified from the BPRR and SOP before starting the process. |
III. Milling | ||||||
1 | Milling may be done through wrong mill screen. | 2 | 8 | 2 | 32 | Mill screen no is verified from the BPRR before commencing the operation. |
2 | Milling may be done through wrong speed or direction of knives. | 2 | 8 | 2 | 32 | Milling speed and knives direction is verified from the BPRR before the milling process. |
3 | Contamination may be occurred from the left over residue of the previous product. | 2 | 8 | 3 | 48 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before the milling process. |
4 | Temp., Relative humidity and differential pressure may go out of limit. | 5 | 4 | 3 | 60 | All the condition is verified from the BPRR and SOP before starting the process. |
IV. Dry Mixing | ||||||
1 | Improper mixing or de mixing may be occurred during dry mixing stage. | 2 | 8 | 2 | 32 | Impeller and chopper speed, dry mixing time is ensured from the BPRR before starting the operation. |
2 | Spillage of material through the discharge port may occur during dry mixing. | 1 | 10 | 4 | 40 | Inter locking facility is there in the RMG. |
3 | Contamination arises from the left over residue of the previous product. | 1 | 10 | 4 | 40 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before the dry mixing process. |
4 | Temp., Relative humidity and differential pressure may go out of limit. | 5 | 4 | 3 | 60 | All the condition to be verified from the BPRR and SOP before starting the process. |
V. Wet Granulation | ||||||
1 | Contamination arises from the left over residue of the previous product. | 1 | 10 | 4 | 40 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before the wet granulation process. |
2 | Over or under granulation may be occurred. | 3 | 9 | 2 | 54 | Granulating fluid addition rate and impeller and chopper speed is verified from the BPRR. |
VI. Drying | ||||||
1 | Contamination arises from the left over residue of the previous product. | 1 | 10 | 4 | 40 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before the dry mixing process. |
2 | Material loss may occur. | 3 | 3 | 4 | 36 | Sensor performance check is carried out. |
3 | Over or under drying granules may be obtained. | 2 | 5 | 3 | 30 | Inlet, outlet temp. and drying time is ensured from the BPRR. |
4 | Contamination may be occurred from the FBD bag. | 2 | 5 | 2 | 20 | Product dedicated FBD bags are used |
5 | Production of static charge may be occurred. | 3 | 5 | 2 | 30 | Earthing stud is provided. |
VIII. Blending | ||||||
1 | Over and under blending may occurs. | 1 | 10 | 4 | 40 | Blending time is verified from the BPRR. |
2 | Contamination arises from the left over residue of the previous product. | 1 | 10 | 4 | 40 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before the blending process. |
3 | Contamination arises from the addition of wrong material. | 1 | 10 | 4 | 40 | Production personnel check the material before transferring the material to the blender as per specified in the BPRR. |
IX. Compression | ||||||
1 | Temp., Relative humidity and differential pressure may go out of limit. | 5 | 4 | 3 | 60 | All the conditions are verified from the BPRR and SOP before starting the process. |
2 | Wrong material may be taken for compression. | 2 | 10 | 3 | 60 | Production personnel verify the material before compression operation as per specified in the BPRR. |
3 | Contamination can occur from the left over residue of the previous product. | 3 | 9 | 2 | 54 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before compression process. |
4 | Improper die filling may occur which results in wt. variation of the tablet. | 4 | 8 | 2 | 40 | Hopper level sensor with interlocking facility is there also speed of turret is verified against the BPRR. |
5 | Any breakages during running of the compression M/C may cause injury to the persons working there. | 1 | 9 | 2 | 18 | Side door guard with interlocking facility is there. |
6 | Compression parameters may vary from the set value. | 3 | 8 | 2 | 48 | Provision for checking the compression parameters at specified interval mentioned in the BPRR for both production and IPQA personnel. |
7 | Wrong punches may be used for compression. | 2 | 8 | 2 | 32 | Provision given in the BPRR for using the correct punches. |
8 | Wrong labeling of compresses tablets may occur. | 2 | 8 | 2 | 32 | Before labeling all the data should be verified from the BPRR. |
9 | Improper storage condition of the compressed tablets may have impact on the product quality. | 2 | 6 | 2 | 24 | Storage condition mentioned in both SOP and BPRR. |
10 | Black particles may appear in the compressed tablets. | 7 | 3 | 2 | 42 | Excess lubrication may causes black spot. To avoid this dust caps are provided. |
11 | Contamination may arise from any traces of metal. | 1 | 4 | 8 | 32 | Metal detection is performed at compression stage also challenge of metal detector is performed at specified interval of time mentioned in the BPRR. |
X. Coating | ||||||
1 | Contamination can occur from the left over residue of the previous product. | 2 | 8 | 3 | 48 | Cleanliness of the area and equipment is verified by both production and IPQA personnel before coating process. |
2 | Inlet or outlet temp. may be outside from the set value. | 3 | 8 | 2 | 48 | Coating process stops along with the spray rate. |
3 | Compressed tablet of other batch/Products can be taken for coating. | 3 | 9 | 1 | 60 | Each and every container is verified with the label and with the BPRR before taking into coating process. |
4 | Coating parameters may vary from the set value. | 1 | 6 | 4 | 24 | Provision for checking the coating parameters at specified interval mentioned in the BPRR. |
5 | Improper storage condition of the coated tablets may have impact on the product quality. | 2 | 6 | 2 | 24 | Storage condition mentioned in both SOP and BPRR. |
6 | Temp., Relative humidity and differential pressure may go out of limit. | 5 | 4 | 3 | 60 | All the condition to be verified from the BPRR and SOP before starting the process. |